Riverside Parkway - Austell, GA

Situation

On September 17, 2024, Cantsink LLC was called to a property located in Austell, GA, consisting of a large warehouse loading dock and office space. The site featured a small landscaped area directly next to the loading dock and office area. The client had reported a water line rupture that caused potential erosion, leading to settlement concerns. After repairing the water line, the client's engineering firm recommended the use of helical piles and underpinning brackets to prevent any further erosion-based settlement. Cantsink was brought in to install these support systems in the excavated area where the water line had been repaired.

Scope of Work

Cantsink's task was to install two 2.5-40L07-12 single helix helical piles with underpinning brackets (UPBs) were used to provide structural support and mitigate any risk of future settlement due to the water line rupture. The work area was located next to the loading dock, where the excavation had taken place. Cantsink's team carried out the installation of the helical piles, with the objective of stabilizing the site and addressing any ongoing concerns from the water line rupture.

Anchor System

For this job, Cantsink installed two 2.5-40L07-12 single helix helical piles, each equipped with underpinning brackets (UPBs). These piles were specifically chosen due to their load-bearing capacity and effectiveness in stabilizing areas prone to settlement. The piles were installed to a depth of 28 feet to ensure optimal support and prevent any further movement in the area impacted by the water line rupture.

Result

The installation was completed in just 4.5 hours, ensuring minimal disruption to the site. Despite the presence of a gas line and fire service line near the building, Cantsink's team conducted a careful utility locate and discovered the fire line had not been marked. The team hand-dug the area to ensure the fire line was not present, proceeding with the installation without any incidents. The project was successfully completed, with the underpinning system now in place to protect the property from further erosion or settlement issues, providing the client with a stable, long-term solution.